High-efficiency greenfield sawmill in Estonia

For Toftan’s state-of-the-art "Green Field" facility, CGV delivered complete solutions for both raw sorting and planing lines.

Green sorting Dry sorting

About the project

AS Toftan has grown into one of the Baltic region’s most advanced and productive sawmills, with an annual output of approximately 350,000 m³. Toftan 1, originally built in the mid-1990s using mostly second-hand equipment, laid the foundation. Toftan 2 marked a new era — a modern greenfield project focused on high-efficiency stud production.

What we did

CGV was proud to deliver both green and dry sorting systems for what would become one of Europe’s leading stud mills. As with every project, our partnership with Toftan was built on trust, collaboration, and a shared focus on long-term performance — resulting in a facility that exceeded all expectations.


Both lines are connected to a shared stick handling system with accumulation from the dry sorting line, significantly reducing forklift traffic and streamlining overall flow.

Project Specification

Key deliverables
  • Fully integrated intake and green sorting line
  • Twin-line buffer system for uninterrupted sawline flow
  • Custom automation tailored to site layout
  • Delivered within a 6-month timeline
  • Built to support future capacity expansion
Project details
Label Data
Label Data
Label Data
Label Data

“CGV has helped us to modernize and optimize our production. With new technology and improved green sorting, we have increased our capacity.”

Patrick Mörk

Sveden Timber AB

Our projects across Europe

Our projects span across Europe and beyond — always tailored to each customer’s unique production needs.

Toftan AS

High-efficiency greenfield sawmill in Estonia

For Toftan’s state-of-the-art "Green Field" facility, CGV delivered complete solutions for both raw sorting and planing lines.

Green sorting Dry sorting
Bravikens Sawmill

Expanded grading line for non-planed products

As part of Holmen Timber’s production expansion, CGV delivered a new grading line designed to handle non-planed products.

Planer mill
Vida Nössemark

High-Capacity Planer Mill for Vida Nössemark

Built on proven solutions from earlier projects, the result is a modern, efficient facility with strong system integration and reliable output.

Green sorting Planer mill